School ID No Space Name Project No. Description Qnty. Unit CIP Code Svrty Status Edit
Engineering Complex I 363.1 South parking lot Exterior Signage Improvements 1 Install exterior directional signage 2.00 Each 10.825 1.00 Complete Detail
Engineering Complex I 363.2 South entrance Exterior Entry Modifications 1 Modify landing at entry 10.00 LF 10.043 1.50 Detail
Engineering Complex I 363.3 South entrance Exterior Entry Modifications 1 Install automatic door opener 2.00 Each 10.420 1.00 Detail
Engineering Complex I 363.4 East Entrance Exterior Signage Improvements 1 Install exterior directional signage 3.00 Each 10.825 1.00 Detail
Engineering Complex I 363.5 Interior hallway Interior Accessible Route Improvements 1 Remove wall mounted ashtrays 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.6 Interior hallway Interior Signage Improvements 1 Install room identification signs 16.00 Each 10.867 1.00 Detail
Engineering Complex I 363.7 Interior hallway Plumbing Modifications 1 Service drinking fountain 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.8 North entrance Exterior Entry Modifications 1 Modify landing and sidewalk 20.00 LF 10.043 2.00 Detail
Engineering Complex I 363.9 North entrance Exterior Entry Modifications 1 Enlarge vestibule 1.00 Set 10.610 1.50 Detail
Engineering Complex I 363.10 Men's restroom 149 Interior Signage Improvements 1 Install room identification sign 1.00 Each 10.867 1.00 Detail
Engineering Complex I 363.11 Men's restroom 149 Restroom Improvements 1 Lower mirror 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.12 Men's restroom 149 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.13 Men's restroom 149 Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
Engineering Complex I 363.14 Men's restroom 149 Restroom Improvements 1 Lower urinal 1.00 Each 10.919 1.00 Detail
Engineering Complex I 363.15 Men's restroom 149 Restroom Improvements 1 Install accessible toilet compartment 1.00 Each 10.916 1.00 Detail
Engineering Complex I 363.16 Unisex bathroom 148a Restroom Improvements 1 Relocate paper towel dispenser 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.17 Unisex bathroom 148a Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.18 Women restroom 148 Interior Signage Improvements 1 Install room identification sign 1.00 Each 10.867 1.00 Detail
Engineering Complex I 363.19 Women restroom 148 Restroom Improvements 1 Relocate interior door 1.00 Each 10.310 1.00 Detail
Engineering Complex I 363.20 Women restroom 148 Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
Engineering Complex I 363.21 Women restroom 148 Restroom Improvements 1 Install accessible toilet compartment 1.00 Each 10.916 1.00 Detail
Engineering Complex I 363.22 Men's restroom 135 b Interior Signage Improvements 1 Install room identification sign 1.00 Each 10.867 1.00 Detail
Engineering Complex I 363.23 Men's restroom 135 b Restroom Improvements 1 Lower mirror 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.24 Men's restroom 135 b Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
Engineering Complex I 363.25 Men's restroom 135 b Restroom Improvements 1 Install accessible urinal 1.00 Each 10.926 1.00 Detail
Engineering Complex I 363.26 Men's restroom 135 b Restroom Improvements 1 Install accessible toilet compartment 1.00 Each 10.916 1.00 Detail
Engineering Complex I 363.27 Elevator west Elevator Improvements 1 Install elevator signage 4.00 Each 10.653 1.00 Detail
Engineering Complex I 363.28 Men's restroom 224 Interior Signage Improvements 1 Install room identification sign 1.00 Each 10.867 1.00 Detail
Engineering Complex I 363.29 Men's restroom 224 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.30 Men's restroom 224 Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
Engineering Complex I 363.31 Men's restroom 224 Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.32 Women's restroom 223 Restroom Improvements 1 Relocate interior door 1.00 Each 10.310 1.00 Detail
Engineering Complex I 363.33 Women's restroom 223 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.34 Women's restroom 223 Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.35 Women's restroom 223 Restroom Improvements 1 Install toilet compartment self closing hinge 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.36 Women's restroom 223 Restroom Improvements 1 Install toilet compartment door pull 1.00 Per Fixtur 10.933 1.00 Detail
Engineering Complex I 363.37 Women's Restroom 135A Interior Signage Improvements 1 Install room identification sign 1.00 Each 10.867 1.00 Detail
Engineering Complex I 363.38 Women's Restroom 135A Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
Engineering Complex I 363.39 Women's Restroom 135A Restroom Improvements 1 Install accessible toilet compartment 1.00 Each 10.916 1.00 Detail
Engineering Complex I 363.40 Interior hallway Interior Door Modifications 1 Replace interior door hardware 20.00 Each 10.565 1.00 Detail
Engineering Complex I 363.41 Labs Furnishings Renovation 1 Install sink with cabinet 6.00 Each 6.362 1.00 Detail