Capital Improvement Project
CIP for Pan American Center Bldg - ID No: 284.26.1
Building No.
284
Facility
Pan American Center Bldg [
Floor Plans
]
Room/Space
South lobby
Space Type
Entrance
Urgency
Medium
Priority Level
Priority-One
Difficulty
Difficulty Level 1: Readily Achievable
CIP Tracking
In House M&O
Survey No
2.10
Project No.
26
Project Name
Interior Accessible Route Improvements
Project Description
The fire extinguisher cabinet is a protruding object, protruding 10 inches from the face of the wall, 41 inches above the finish floor to the leading edge of the cabinet. Install a shroud the width and depth of the cabinet, from the underside of the cabinet to 27 inches or less above the finish floor.
No.
Description
Cost:
Quantity
Unit
CIP Code
Severity
MACC
TPC
Install shroud
$500.00
$670.00