ID No Space Name Project No. Description Qnty. Unit CIP Code Svrty Status Edit
083.0 KRWG Spaces 1 Junctions of the second type appear as short linear structures that are almost orthogonal to the cell cell borders and are remodeling junctions called focal AJs FAJs cialis prescription 16.00 3283.000 1.00 Detail
083.1 Parking Lot Exterior Signage Improvements 1 Install signs 2.00 Each 10.825 1.00 Detail
083.2 Parking Lot Interior Signage Improvements 1 Install sign 1.00 Each 10.836 1.00 Detail
083.3 Parking Lot Exterior Accessible Route Improvements 1 Install signs 6.00 Each 10.825 1.00 Detail
083.4 Parking Lot Parking Improvements 1 Re-paint striping 6.00 Space 10.003 1.00 Detail
083.5 Parking Lot Parking Improvements 1 Replace parking spaces 2.00 Space 10.002 1.00 Detail
083.6 Parking Lot Parking Improvements 1 Install sign 1.00 Each 10.816 1.00 Detail
083.7 Accessible Route Exterior Accessible Route Improvements 1 New landing and ramp 15.00 LF 10.077 1.00 Detail
083.8 Accessible Route Exterior Accessible Route Improvements 1 Install handrail 24.00 LF 10.093 1.00 Detail
083.9 Accessible Route Exterior Accessible Route Improvements 1 New curb ramp 13.00 LF 10.043 1.00 Detail
083.10 Accessible Route Interior Accessible Route Improvements 1 Handrail extensions 8.00 Each 10.094 1.00 Detail
083.11 Accessible Route Exterior Accessible Route Improvements 1 Install warning strips 10.00 LF 10.962 1.00 Detail
083.12 Restrooms 129A & 129B Restroom Improvements 1 Lower coat hooks 2.00 Each 10.923 1.00 Detail
083.13 Restrooms 129A & 129B Furnishings Renovation 1 Restroom counter modifications 12.00 LF 4.610 1.00 Detail
083.14 Restrooms 129A & 129B Restroom Improvements 1 Lower urinal 1.00 Each 10.919 1.00 Detail
083.15 Restrooms 129A & 129B Restroom Improvements 1 Install grab bars 1.00 Set 10.921 1.00 Detail
083.16 Classroom Offices 1 Interior Door Modifications 1 Install lever door hardware 16.00 Each 10.565 1.00 Detail
083.17 Classroom Offices 1 Electrical Modifications 1 Adjust electrical device heights 85.00 Each 10.682 1.00 Detail
083.18 Classroom Offices 2 Interior Door Modifications 1 Install hardware 15.00 Each 10.565 1.00 Detail
083.19 Classroom Offices 2 Electrical Modifications 1 Re-locate electrical devices 75.00 Each 10.682 1.00 Detail
083.20 Entrance 105 Exterior Entry Modifications 1 Replace sign 1.00 Each 10.825 1.00 Detail
083.21 Room 100C Interior Door Modifications 1 Renovate the door approach 1.00 Each 10.550 1.00 Detail
083.22 KRWG Spaces Electrical Modifications 1 Relocate electrical devices 160.00 Each 10.682 1.00 Detail
083.23 H104 Offices Interior Door Modifications 1 Remove doors 2.00 Each 10.535 1.00 Detail
083.24 H104 Offices Interior Door Modifications 1 Replace locksets 11.00 Each 10.565 1.00 Detail
083.25 H104 Offices Furnishings Renovation 1 Relocate electrical devices 50.00 Each 10.682 1.00 Detail
083.26 H104 Offices Interior Accessible Route Improvements 1 Install ramp 110.00 LF 10.074 1.00 Detail
083.27 Stairway 4 Exterior Accessible Route Improvements 1 Install compliant trench drains 40.00 LF 10.051 1.00 Detail
083.31 KRWG Spaces Interior Door Modifications 1 Install hardware 40.00 Each 10.682 1.00 Detail
083.32 Stairway 4 Interior Accessible Route Improvements 1 Install railing 50.00 LF 10.093 1.00 Detail
083.33 Stairway 4 Interior Accessible Route Improvements 1 Weld extensions 18.00 Each 10.094 1.00 Detail
083.34 H104 Offices Interior Accessible Route Improvements 1 Install handrail 10.00 LF 10.093 1.00 Detail
083.35 H104 Offices Interior Accessible Route Improvements 1 Weld extension 1.00 Each 10.094 1.00 Detail
083.36 Patio 3 Exterior Accessible Route Improvements 1 Weld pipe railing 12.00 LF 10.096 1.00 Detail
083.37 Patio 3 Exterior Accessible Route Improvements 1 Weld extensions 6.00 Each 10.094 1.00 Detail
083.39 KRWG Spaces Furnishings Renovation 1 Renovate counter and cabinet 2.00 Each 10.945 1.00 Detail
083.40 H103 Classrooms Electrical Modifications 1 Relocate electrical devices 32.00 Each 10.682 1.00 Detail
083.41 H103 Classrooms Furnishings Renovation 1 Remove and replace non-load bearing wall 300.00 SF 4.510 1.00 Detail
083.42 H103 Classrooms Interior Door Modifications 1 Install new doors 4.00 Each 10.305 1.00 Detail
083.43 Theater 171 Furnishings Renovation 1 Provide wheelchair spaces and assistive listening devices 0.00 - 0.000 1.00 Detail
083.44 ROOM 169 Furnishings Renovation 1 Install two wheelchair spaces 2.00 Location 10.952 1.00 Detail
083.45 ROOM 169 Electrical Modifications 1 Provide mobile units 2.00 System 10.955 1.00 Detail
083.46 ROOM 169 Electrical Modifications 1 Relocate electrical devices 30.00 Each 10.682 1.00 Detail
083.47 Room 185M Plumbing Modifications 1 Install pipe protection 1.00 Each 10.922 1.00 Detail
083.48 Room 185N Furnishings Renovation 1 Relocate electrical switch 1.00 Each 10.682 1.00 Detail
083.49 Stairway 2 Interior Accessible Route Improvements 1 Install handrails 50.00 LF 10.255 1.00 Detail
083.50 Stairway 1 Interior Accessible Route Improvements 1 Install handrails 50.00 LF 10.093 1.00 Detail
083.51 Stairway 5 Interior Accessible Route Improvements 1 Install handrails 50.00 LF 10.093 1.00 Detail
083.52 H103 Classrooms Furnishings Renovation 1 Relocate fire extinguishers 2.00 Each 10.923 1.00 Detail
083.53 H011 Interior Accessible Route Improvements 1 Relocate electrical switch 10.00 Each 10.682 1.00 Detail
083.54 Entrance H100A Exterior Entry Modifications 1 Install new sign 1.00 Each 10.825 1.00 Detail
083.55 Migrant Program Exterior Entry Modifications 1 Adjust door closer 1.00 Each 10.566 1.00 Detail
083.56 Migrant Program Furnishings Renovation 1 Install work surface 3.00 LF 4.688 1.00 Detail
083.57 Migrant Program Restroom Improvements 1 Relocate soap dispenser 1.00 Each 10.923 1.00 Detail
083.58 English Department Restroom Improvements 1 Install grab bars 1.00 Set 10.921 1.00 Detail
083.59 H010 Restroom Improvements 1 Lower counter top 2.00 Section 10.942 1.00 Detail
083.60 H010 Restroom Improvements 1 Lower sinks 2.00 Each 10.919 0.55 Detail
083.61 H010 Plumbing Modifications 1 Install drinking fountain 1.00 Each 10.672 1.00 Detail
083.62 Fire Extinguishers Furnishings Renovation 1 Relocate Fire Extinguishers 34.00 Each 10.681 1.00 Detail
083.63 Fire Extinguishers Furnishings Renovation 1 Install edge protection 24.00 Location 10.674 1.00 Detail
083.64 H010 Furnishings Renovation 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
083.65 H010 Restroom Improvements 1 Lower urinal 1.00 Each 10.919 1.00 Detail
083.66 H010 Restroom Improvements 1 Install grab bars 1.00 Set 10.921 1.00 Detail
083.67 H010 Restroom Improvements 1 Lower paper towel dispenser 1.00 Each 10.923 1.00 Detail
083.68 Elevator 1 Elevator Improvements 1 Install signage 1.00 Each 10.657 1.00 Detail
083.69 Elevator 1 Elevator Improvements 1 Install audible device 1.00 Each 10.654 1.00 Detail
083.70 Elevator 1 Elevator Improvements 1 Install signage 4.00 Each 10.868 1.00 Detail






Return to Drawings List