ID No Space Name Project No. Description Qnty. Unit CIP Code Svrty Status Edit
284.1 North parking lot Parking Improvements 1 New directional signs 2.00 Each 10.825 1.00 Detail
284.2 Northeast parking lot Parking Improvements 1 Install signs 4.00 Each 10.061 1.00 Detail
284.3 North lobby Interior Accessible Route Improvements 1 Install shroud 1.00 Per Fixtur 10.933 1.00 Detail
284.4 Northeast parking lot Parking Improvements 1 Parking space identification sign van 1.00 Each 10.816 1.00 Detail
284.5 Northeast parking lot Parking Improvements 1 Parking space signs 57.00 Each 10.816 1.00 Detail
284.6 North parking lot Parking Improvements 1 Parking space pavement striping 4.00 Space 10.003 1.00 Detail
284.7 North parking lot Exterior Accessible Route Improvements 1 Exterior directional signage 6.00 Each 10.825 1.00 Detail
284.8 Accessible route NE parking to door Exterior Accessible Route Improvements 1 Detectable warning strip 5.00 LF 10.962 1.00 Detail
284.9 Accessible route NE parking to door Exterior Accessible Route Improvements 1 Accessible entry sign 1.00 Each 10.837 1.00 Detail
284.10 Accessible route NE parking to door Exterior Entry Modifications 1 Entry door modification 1.00 Per door 4.731 1.00 Detail
284.11 Accessible route NE parking to door Exterior Entry Modifications 1 Automatic door opener 1.00 Each 10.420 1.00 Detail
284.12 Accessible route NE parking to door Exterior Entry Modifications 1 Entry mat 12.00 SF 4.597 1.00 Detail
284.13 Accessible route NE parking to door Exterior Accessible Route Improvements 1 Install handrail 90.00 LF 10.092 1.00 Detail
284.15 Accessible from north lot to building Exterior Accessible Route Improvements 1 Detectable warning strip 6.00 LF 10.962 1.00 Detail
284.17 Accessible from north lot to building Exterior Entry Modifications 1 Entry door modification 1.00 Per door 4.731 1.00 Detail
284.18 Accessible from north lot to building Exterior Entry Modifications 1 Automatic door opener 1.00 Each 10.420 1.00 Detail
284.19 Accessible from north lot to building Exterior Entry Modifications 1 Entry mat 12.00 SF 4.597 1.00 Detail
284.20 North lobby Interior Accessible Route Improvements 1 Install shroud 1.00 Per Fixtur 10.933 1.00 Detail
284.21 North lobby Furnishings Renovation 1 Concession counter 1.00 Section 10.942 1.00 Detail
284.22 Ticket lobby Exterior Entry Modifications 1 Automatic door openers 2.00 Each 10.405 1.00 Detail
284.25 Ticket lobby Furnishings Renovation 1 Ticket counter 1.00 Section 10.942 1.00 Detail
284.26 South lobby Interior Accessible Route Improvements 1 Install shroud 1.00 Per Fixtur 10.933 1.00 Detail
284.27 East concourse Interior Accessible Route Improvements 1 Install detectable warning 1.00 Per Fixtur 10.933 1.00 Detail
284.28 Mens Restroom 118 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.29 Mens Restroom 118 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.30 Mens Restroom 118 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.31 Mens Restroom 127 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.32 Mens Restroom 127 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.33 Womens Restroom 128 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.34 Womens Restroom 128 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.35 Womens Restroom 127 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.36 Womens Restroom 127 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.37 Mens Restroom 124 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.38 Mens Restroom 124 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.39 Womens Restroom 122 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.40 Womens Restroom 119 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.41 Womens Restroom 119 Restroom Improvements 1 Toilet stall door hinge 1.00 Per Fixtur 10.933 1.00 Detail
284.42 Womens Restroom 119 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.43 Womens Restroom 118 Interior Signage Improvements 1 Room identification sign 1.00 Each 10.867 1.00 Detail
284.44 Womens Restroom 118 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.45 Womens Restroom 118 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.46 New Lobby 148 Exterior Entry Modifications 1 Entry mat 12.00 SF 4.597 1.00 Detail
284.48 Mens Restroom 148B Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.49 Mens Restroom 148B Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.50 Womens Restroom 148A Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.51 East Corridor H150 Exterior Entry Modifications 1 Door actuator 1.00 Each 10.420 1.00 Detail
284.52 East Corridor H150 Exterior Entry Modifications 1 Entry mat 12.00 SF 4.597 1.00 Detail
284.55 Cardio Room 160A Interior Accessible Route Improvements 1 Equipment relocation 1.00 Per Fixtur 10.933 1.00 Detail
284.57 Office Lobby 253 Furnishings Renovation 1 Counter renovation 3.00 LF 10.947 1.00 Detail
284.60 2nd Floor E End 253 Interior Door Modifications 1 Modify existing door 1.00 Each 10.314 1.00 Detail
284.61 Southeast Parking Lot Exterior Accessible Route Improvements 1 Exterior directional signage 2.00 Each 10.825 1.00 Detail
284.62 Visiting Locker Room 156A Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.63 Visiting Locker Room 156A Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.64 Mens Restroom 104 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.65 Mens Restroom 104 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.66 Mens Restroom 104 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.67 Mens Restroom 105 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.68 Mens Restroom 105 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.69 Mens Restroom 105 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.70 Womens Restroom 105 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.71 Womens Restroom 105 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.72 Womens Restroom 105 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.73 Mens Restroom 107 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.74 Mens Restroom 107 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.75 Womens Restroom 107 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.76 Womens Restroom 107 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.77 Womens Restroom 107 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.78 Police Suite Restroom 107 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.79 Womens Restroom 108 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.80 Womens Restroom 108 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.81 Womens Restroom 108 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.82 Family Restroom 110 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.83 Womens Restroom 113 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.84 Womens Restroom 113 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.85 Womens Restroom 113 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.86 Mens Restroom 113 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.87 Mens Restroom 113 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.88 Mens Restroom 113 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.89 Womens Restroom 114 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.90 Womens Restroom 114 Restroom Improvements 1 Vertical grab bar 2.00 Per Fixtur 10.933 1.00 Detail
284.91 Womens Restroom 114 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.92 EMS Suite Restroom 144 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.93 Conference Room Restroom 250 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.94 Conference Room Restroom 250 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.95 Conference Room Restroom 250 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.96 Womens Restroom 148A Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.97 Womens Restroom 148A Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.98 Womens Restroom 148A Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.99 Mens Restroom 166A Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.100 Mens Restroom 166A Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.101 Mens Restroom 166A Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.102 Womens Restroom 166B Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.103 Womens Restroom 166B Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.104 Womens Restroom 166B Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.105 Womens Restroom 251A Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.106 Womens Restroom 251A Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.107 Womens Restroom 251A Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.108 Mens Restroom 251B Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.109 Mens Restroom 251B Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.110 Mens Restroom 251B Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.111 Officials Locker Room 152E Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.112 Officials Locker Room 152E Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.113 Officials Locker Room 152E Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.114 Officials Locker Room 152E Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.115 Officials Locker Room 152D Restroom Improvements 1 Locker room bench 1.00 Per Fixtur 10.933 1.00 Detail
284.116 Officials Locker Room 152D Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.117 Officials Locker Room 152D Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.118 Officials Locker Room 152D Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.119 Visiting Locker Room 156A Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.120 Visiting Locker Room 156A Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.121 Visiting Locker Room 156A Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.122 Visiting Locker Room 156A Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.123 Visiting Locker Room 156C Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.124 Visiting Locker Room 156C Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.125 Visiting Locker Room 156C Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.126 Visiting Locker Room 156C Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.127 Mens Basketball Locker Room 151 Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.128 Mens Basketball Locker Room 151 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.129 Mens Basketball Locker Room 151 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.130 Mens Basketball Locker Room 151 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.131 Womens Basketball Locker Room 153 Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.132 Womens Basketball Locker Room 153 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.133 Womens Basketball Locker Room 153 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.134 Womens Basketball Locker Room 153 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.135 Womens Volleyball Locker Room 159 Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.136 Womens Volleyball Locker Room 159 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.137 Womens Volleyball Locker Room 159 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.138 Womens Volleyball Locker Room 159 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.139 Coaches Locker Room Mens 155 Restroom Improvements 1 Locker room bench 1.00 Each 4.698 1.00 Detail
284.140 Coaches Locker Room Mens 155 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.141 Coaches Locker Room Mens 155 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.142 Coaches Locker Room Mens 155 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.143 Coaches Locker Room Womens 157 Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
284.144 Coaches Locker Room Womens 157 Restroom Improvements 1 Vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
284.145 Coaches Locker Room Womens 157 Restroom Improvements 1 Toilet stall door pull 1.00 Per Fixtur 10.933 1.00 Detail
284.146 Arena Furnishings Renovation 1 Install wheelchair seating spaces 6.00 Location 10.952 3.00 Detail
284.147 Arena Technology Upgrades 1 Furnish assistive listening devices 160.00 System 10.955 1.00 Detail