ID No Space Name Project No. Description Qnty. Unit CIP Code Svrty Status Edit
365.1 Parking #14 - striping Parking Improvements 1 Re-stripe parking stalls and aisles 7.00 Space 10.003 1.00 Detail
365.2 Parking #14 - corner curb ramp Exterior Accessible Route Improvements 1 Re-paint corner curb ramps 2.00 Each 10.066 1.00 Detail
365.3 Parking #14 corner curb ramp - warning stripes Exterior Accessible Route Improvements 1 Install detectable warning strips 16.00 SF 10.047 1.00 Detail
365.4 Parking #14 walkway handrails Exterior Accessible Route Improvements 1 Install Handrails 160.00 LF 10.092 1.00 Detail
365.5 Parking upper level - re-paint Exterior Accessible Route Improvements 1 Repaint curb ramp 1.00 Each 10.066 1.00 Detail
365.6 Parking upper level curb ramp - flared sides Exterior Accessible Route Improvements 1 Install flared sides 2.00 Each 10.063 1.00 Detail
365.7 Parking upper level curb ramp - warning stripes Exterior Accessible Route Improvements 1 Install detectable warning strip 4.00 SF 10.047 1.00 Detail
365.8 Restroom 1st Floor 148A - coat hook Restroom Improvements 1 Install a coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.9 Restroom 1st Floor 148A - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
365.10 Restroom 1st Floor 148A - faucet Restroom Improvements 1 Install new faucet 1.00 Set 10.920 1.00 Detail
365.11 Restroom 1st Floor 148A - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.12 Restroom 1st Floor 148A - flush control Restroom Improvements 1 Install flush control in the wall 1.00 Each 10.919 1.00 Detail
365.13 Restroom 1st Floor 148A - rear grab bar Restroom Improvements 1 Install rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.14 Restroom 1st Floor 148B - coat hook Restroom Improvements 1 Install coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.15 Restroom 1st Floor 148B - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
365.16 Restroom 1st Floor 148B - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.17 Restroom 1st Floor 148B - flush control Restroom Improvements 1 Install flush control in the wall 1.00 Each 10.919 1.00 Detail
365.18 Restroom 1st Floor 148B - rear grab bar Restroom Improvements 1 Install rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.19 Drinking Fountain at Rm 148A - wing walls Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
365.20 Restroom 1st Floor R181 - trash can Restroom Improvements 1 Relocate trash can 1.00 Per Fixtur 10.933 1.00 Detail
365.21 Restroom 1st Floor R181 - coat hook Restroom Improvements 1 Install coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.22 Restroom 1st Floor R181 - toilet paper dispenser Restroom Improvements 1 Relocate toilet paper dispenser 1.00 Per Fixtur 10.933 1.00 Detail
365.23 Restroom 1st Floor R181 - soap dispenser Restroom Improvements 1 Relocate soap dispenser 1.00 Per Fixtur 10.933 1.00 Detail
365.24 Restroom 1st Floor R181 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.25 Restroom 1st Floor R182 - coat hook Restroom Improvements 1 Install coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.26 Restroom 1st Floor R182 - toilet paper dispenser Restroom Improvements 1 Relocate toilet paper dispenser 1.00 Per Fixtur 10.933 1.00 Detail
365.27 Restroom 1st Floor R182 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.28 Drinking Fountain at Rm R182 - wing walls Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
365.29 Room signs - 1st Floor Interior Signage Improvements 1 Install room identification signs 6.00 Each 10.867 1.00 Detail
365.30 Interior Doors 1st Floor - clearance Interior Door Modifications 1 Move existing doors 7.00 Each 10.314 1.00 Detail
365.31 Interior Doors 1st Floor - hardware Interior Door Modifications 1 Replace interior door hardware 17.00 Each 10.565 1.00 Detail
365.32 Service Counter Rm 157 - door clearance Interior Door Modifications 1 Relocate service counter 1.00 - 0.000 1.00 Detail
365.33 Service Counter Rm 157 - service counter Furnishings Renovation 1 Lower section of counter 1.00 Section 10.942 1.00 Detail
365.34 Room 176 - counter Furnishings Renovation 1 Lower section of counter 1.00 Section 10.942 1.00 Detail
365.35 Stair ST1 - handrail extensions Interior Accessible Route Improvements 1 Install handrail extensions 7.00 Each 10.270 1.00 Detail
365.36 Stair ST1 - warning stripes Interior Accessible Route Improvements 1 Install detectable warning strips 5.00 SF 10.047 1.00 Detail
365.37 Entrance South - handrail extensions Exterior Accessible Route Improvements 1 Install handrail extensions 2.00 Each 10.270 1.00 Detail
365.38 Restroom 2nd Floor Male R240 - entrance Interior Accessible Route Improvements 1 Modify door closer 1.00 Per Fixtur 10.933 1.00 Detail
365.39 Restroom 2nd Floor Male R240 - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.40 Restroom 2nd Floor Male R240 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.41 Restroom 2nd Floor Male R240 - door self closing Restroom Improvements 1 Adjust ADA toilet partition door 1.00 Per Fixtur 10.933 1.00 Detail
365.42 Restroom 2nd Floor Male R240 - door pulls Restroom Improvements 1 Install toilet partition door pulls 2.00 Per Fixtur 10.933 0.50 Detail
365.43 Restroom 2nd Floor Female R242 - entrance Restroom Improvements 1 Modify door closer 1.00 Per Fixtur 10.933 1.00 Detail
365.44 Restroom 2nd Floor Female R242 - coat hook Restroom Improvements 1 Install coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.45 Restroom 2nd Floor Female R242 - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
365.46 Restroom 2nd Floor Female R242 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.47 Restroom 2nd Floor Female R242 - door clearance Restroom Improvements 1 Relocate ADA toilet partition door 1.00 Room 10.914 0.10 Detail
365.48 Restroom 2nd Floor Female R242 Restroom Improvements 1 Install toilet partition door pulls 2.00 Per Fixtur 10.933 0.50 Detail
365.49 Drinking Fountain at Rm 241 - wing walls Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
365.50 Stair ST2 - warning stripes Interior Accessible Route Improvements 1 Install detectable warning strips 5.00 SF 10.047 1.00 Detail
365.51 Stair ST2 - handrail extensions Exterior Accessible Route Improvements 1 Install handrail extensions 6.00 Each 10.270 1.00 Detail
365.52 Stair ST3 - warning stripes Interior Accessible Route Improvements 1 Install detectable warning strips 5.00 SF 10.047 1.00 Detail
365.53 Stair ST3 - handrail extension Interior Accessible Route Improvements 1 Install handrail extensions 5.00 Each 10.270 1.00 Detail
365.54 Room Signs - 2nd Floor Interior Signage Improvements 1 Install room identification signs 5.00 Each 10.867 1.00 Detail
365.55 Interior Doors 2nd Floor - hardware Interior Door Modifications 1 Replace interior door hardware 24.00 Each 10.565 1.00 Detail
365.56 Interior Doors 2nd Floor - clearance Interior Door Modifications 1 Move existing doors 5.00 Each 10.314 1.00 Detail
365.57 Restroom 3rd Floor Female R312 coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.58 Restroom 3rd Floor Female R312 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.59 Restroom 3rd Floor Female R312 - door clearance Restroom Improvements 1 Relocate ADA toilet partition door 1.00 Room 10.914 0.10 Detail
365.60 Restroom 3rd Floor Female R312 - door pulls Restroom Improvements 1 Install toilet partition door pulls 2.00 Per Fixtur 10.933 0.50 Detail
365.61 Restroom 3rd Floor Male R310 - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
365.62 Restroom 3rd Floor Male R310 - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
365.63 Restroom 3rd Floor Male R310 - door self closing Restroom Improvements 1 Modify toilet partition door 1.00 Per Fixtur 10.933 1.00 Detail
365.64 Restroom 3rd Floor Male R310 - door pulls Restroom Improvements 1 Install toilet partition door pulls 2.00 Per Fixtur 10.933 0.50 Detail
365.65 Drinking Fountain at Rm 314 - wing walls Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
365.66 Room signs 3rd Floor Interior Signage Improvements 1 Install room identification signs 2.00 Each 10.867 1.00 Detail
365.67 Interior Doors 3rd Floor - clearance Interior Door Modifications 1 Relocate interior doors 4.00 Each 10.314 1.00 Detail
365.68 Interior Doors 3rd Floor - hardware Interior Door Modifications 1 Replace interior door hardware 25.00 Each 10.565 1.00 Detail
365.69 Room 308, 308A - counter Furnishings Renovation 1 Lower section of counter 2.00 Section 10.942 1.00 Detail
365.71 Stair ST1 - area of refuge Interior Accessible Route Improvements 1 Construct an Area of Refuge 2.00 Each 10.659 1.00 Detail
365.72 Stair ST3 - area of refuge Interior Accessible Route Improvements 1 Construct an Area of Refuge 2.00 Each 10.659 1.00 Detail