ID No Space Name Project No. Description Qnty. Unit CIP Code Svrty Status Edit
368.1 Entrance South - Handrails Exterior Accessible Route Improvements 1 Install Handrail at ramp 28.00 LF 10.092 1.00 Detail
368.2 Entrance South - ramp landing Exterior Accessible Route Improvements 1 Provide Landing and new ramp 35.00 LF 10.043 1.00 Detail
368.3 Entrance South - warning stripes Exterior Accessible Route Improvements 1 Install warning strips 8.00 SF 10.047 1.00 Detail
368.4 Entrance East - curb ramp Exterior Accessible Route Improvements 1 Install a new curb ramp 1.00 Each 10.061 1.00 Detail
368.5 Entrance East - push button ADO Exterior Accessible Route Improvements 1 Install an automatic door opener push button 1.00 Each 10.420 1.00 Detail
368.6 Entrance North - directional signage Exterior Accessible Route Improvements 1 Install directional signange 2.00 Each 10.825 1.00 Detail
368.7 Entrance North - Handrails Exterior Accessible Route Improvements 1 Intall Handrail extensions 1.00 Each 10.270 1.00 Detail
368.8 Entrance West - handrail extensions Exterior Accessible Route Improvements 1 Install Handrail extensions 4.00 Each 10.270 1.00 Detail
368.9 Entrance West Exterior Entry Modifications 1 Repair automatic door opener 1.00 Per Fixtur 10.933 1.00 Detail
368.10 Stair ST1 - handrail extensions Interior Accessible Route Improvements 1 Install handrail extensions 5.00 Each 10.270 1.00 Detail
368.11 Stair ST2 - handrail extensions Interior Accessible Route Improvements 1 Install handrail extensions 5.00 Each 10.270 1.00 Detail
368.12 Stair ST3 - handrail extensions Interior Accessible Route Improvements 1 Install Handrail extensions 5.00 Each 10.270 1.00 Detail
368.13 Stair ST4 - handrail extensions Interior Accessible Route Improvements 1 Install Handrail extensions 5.00 Each 10.270 1.00 Detail
368.14 Restroom 1st Floor 134F - ashtrays, shelves Restroom Improvements 1 Remove protruding items 2.00 Per Fixtur 10.933 1.00 Detail
368.15 Restroom 1st Floor 134F - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
368.16 Restroom 1st Floor 134F - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.17 Restroom 1st Floor 134F - vertical grab bar Restroom Improvements 1 Install a vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.18 Restroom 1st Floor 134F - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.19 Restroom 1st Floor 134F - door self closing Restroom Improvements 1 Adjust ADA stall door 1.00 Per Fixtur 10.933 1.00 Detail
368.20 Restroom 1st Floor 134F - door pulls Restroom Improvements 1 Install door pulls 1.00 Per Fixtur 10.933 1.00 Detail
368.21 Restroom 1st Floor 134G - shelf Restroom Improvements 1 Remove protruding item 1.00 Per Fixtur 10.933 1.00 Detail
368.22 Restroom 1st Floor 134G - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
368.23 Restroom 1st Floor 134G - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.24 Restroom 1st Floor 134G - Urinal Restroom Improvements 1 Lower Urinal 1.00 Each 10.919 1.00 Detail
368.25 Restroom 1st Floor 134G - vertical grab bar Restroom Improvements 1 Install a vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.26 Restroom 1st Floor 134G - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.27 Restroom 1st Floor 134G - door pulls Restroom Improvements 1 Install door pulls 1.00 Per Fixtur 10.933 1.00 Detail
368.28 Architectural Barriers - drinking fountain Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
368.29 Interior doors 1st Floor - Clearance Interior Door Modifications 1 Move existing doors 3.00 Each 10.314 1.00 Detail
368.30 Interior doors 1st Floor - hardware Interior Door Modifications 1 Install complaint hardware 52.00 Each 10.565 1.00 Detail
368.31 Interior doors 1st Floor - force Interior Door Modifications 1 Adjust door closer 4.00 Each 10.566 1.00 Detail
368.32 Interior doors 1st Floor - Room signs Interior Door Modifications 1 Install room identification signs 6.00 Each 10.867 1.00 Detail
368.33 Classrooms, Labs 1st Floor - counter Furnishings Renovation 1 Lower section of counter 15.00 Section 10.942 1.00 Detail
368.34 Classrooms, Labs 1st Floor - sink Plumbing Modifications 1 Lower sink 15.00 Each 10.945 1.00 Detail
368.35 Restroom 2nd Floor 201E - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
368.36 Restroom 2nd Floor 201E - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.37 Restroom 2nd Floor 201E - vertical grab bar Restroom Improvements 1 Install a vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.38 Restroom 2nd Floor 201E - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.39 Restroom 2nd Floor 201E - door self closing Restroom Improvements 1 Adjust ADA stall door 1.00 Per Fixtur 10.933 1.00 Detail
368.40 Restroom 2nd Floor 201E - door pulls Restroom Improvements 1 Install door pull 1.00 Per Fixtur 10.933 1.00 Detail
368.41 Restroom 2nd Floor 201F - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
368.42 Restroom 2nd Floor 201F - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.43 Restroom 2nd Floor 201F - Urinal Restroom Improvements 1 Lower Urinal 1.00 Each 10.919 1.00 Detail
368.44 Restroom 2nd Floor 201F - vertical grab bar Restroom Improvements 1 Install vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.45 Restroom 2nd Floor 201F - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.46 Restroom 2nd Floor 201F - door pull Restroom Improvements 1 Install door pulls 1.00 Per Fixtur 10.933 1.00 Detail
368.47 Architectural Barriers 2nd Floor - ashtray Interior Accessible Route Improvements 1 Remove ashtrays 1.00 Per Fixtur 10.933 1.00 Detail
368.48 Architectural Barriers 2nd Floor - Drinking Fountains Interior Accessible Route Improvements 1 Install side wall protection 2.00 Location 10.674 1.00 Detail
368.49 Interior Doors 2nd Floor - clearance Interior Door Modifications 1 Move existing doors 8.00 Each 10.314 1.00 Detail
368.50 Interior Doors 2nd Floor - hardware Interior Door Modifications 1 Install complaint hardware 55.00 Each 10.565 1.00 Detail
368.51 Interior Doors 2nd Floor - force Interior Door Modifications 1 Adjust door closer 3.00 Each 10.566 1.00 Detail
368.52 Interior Doors 2nd Floor - Room signs Interior Door Modifications 1 Install room identification signs 3.00 Each 10.867 1.00 Detail
368.53 Classroom, Labs 2nd Floor - counter Furnishings Renovation 1 Lower section of counter 10.00 Section 10.942 1.00 Detail
368.54 Classroom, Labs 2nd Floor - sink Furnishings Renovation 1 Lower sink 10.00 Each 10.945 1.00 Detail
368.55 Restroom 3rd Floor 300E - coat hook Restroom Improvements 1 Lower coat hook 1.00 Per Fixtur 10.933 1.00 Detail
368.56 Restroom 3rd Floor 300E - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.57 Restroom 3rd Floor 300E - vertical grab bar Restroom Improvements 1 Install a vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.58 Restroom 3rd Floor 300E - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.59 Restroom 3rd Floor 300E - door self closing Restroom Improvements 1 Adjust ADA stall door 1.00 Per Fixtur 10.933 1.00 Detail
368.60 Restroom 3rd Floor 300E - door pulls Restroom Improvements 1 Install door pull 1.00 Per Fixtur 10.933 1.00 Detail
368.61 Restroom 3rd Floor 300F - coat hook Restroom Improvements 1 Lower and move coat hooks 1.00 Per Fixtur 10.933 1.00 Detail
368.62 Restroom 3rd Floor 300F - pipe insulation Restroom Improvements 1 Install pipe insulation 1.00 Each 10.922 1.00 Detail
368.63 Restroom 3rd Floor 300F - Urinal Restroom Improvements 1 Lower Urinal 1.00 Each 10.919 1.00 Detail
368.64 Restroom 3rd Floor 300F - vertical grab bar Restroom Improvements 1 Install a vertical grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.65 Restroom 3rd Floor 300F - rear grab bar Restroom Improvements 1 Install a rear grab bar 1.00 Per Fixtur 10.933 1.00 Detail
368.66 Restroom 3rd Floor 300F - door self closing Restroom Improvements 1 Adjust ADA stall door 1.00 Per Fixtur 10.933 1.00 Detail
368.67 Restroom 3rd Floor 300F - door pull Restroom Improvements 1 Install door pull 1.00 Per Fixtur 10.933 1.00 Detail
368.68 Architectural Barriers 3rd Floor - ashtrays and shelves Interior Accessible Route Improvements 1 Remove protruding items 3.00 Per Fixtur 10.933 1.00 Detail
368.69 Architectural Barriers 3rd Floor - Drinking Founain Interior Accessible Route Improvements 1 Install a drinking fountian 1.00 Each 10.672 1.00 Detail
368.70 Architectural Barriers 3rd Floor - drinking fountain 2 Interior Accessible Route Improvements 1 Install side wall protection 1.00 Location 10.674 1.00 Detail
368.71 Interior Doors 3rd Floor - clearance Interior Door Modifications 1 Move existing doors 8.00 Each 10.314 1.00 Detail
368.72 Interior Doors 3rd Floor - hardware Interior Door Modifications 1 Install complaint hardware 66.00 Each 10.565 1.00 Detail
368.73 Interior Doors 3rd Floor - force Interior Door Modifications 1 Adjust door closer 6.00 Each 10.566 1.00 Detail
368.74 Interior Doors 3rd Floor - Room signs Interior Door Modifications 1 Install room identification signs 1.00 Each 10.867 1.00 Detail
368.75 Classroom, Labs 3rd Floor - counter Furnishings Renovation 1 Lower section of counter 12.00 Section 10.942 1.00 Detail
368.76 Classroom, Labs 3rd Floor - sink Furnishings Renovation 1 Lower sink 12.00 Each 10.945 1.00 Detail
368.77 Restroom 1st Floor 134F - flush control Restroom Improvements 1 Lower flush control 1.00 Each 10.925 1.00 Detail
368.78 Restroom 1st Floor 134G - flush control Restroom Improvements 1 Lower flush control 1.00 Each 10.925 1.00 Detail
368.79 Restroom 2nd Floor 201F - flush control Restroom Improvements 1 Lower flush control 1.00 Each 10.925 1.00 Detail
368.80 Restroom 3rd Floor 300E - flush control Restroom Improvements 1 Lower flush control 1.00 Each 10.925 1.00 Detail