Architectural Research Consultants, Incorporated
Return CIP List
Return Facility Menu
Return Main Menu
Capital Improvement Project
CIP for Milton Hall - ID No: 083.48.1
Building No.
083
Facility
Milton Hall [
Floor Plans
]
Room/Space
Room 185N
Space Type
Urgency
Low
Priority Level
Priority-One
Difficulty
Difficulty Level 1: Readily Achievable
CIP Tracking
In House M&O
Survey No
2.57
Related ADA Code Lookups:
[
305.3
] [
309.3
] [
308
]
Project No.
48
Project Name
Furnishings Renovation
Project Description
The light switch is over 48 inches above the floor. Relocate the light switch to less than 48 inches above floor.
No.
Description
Cost:
Quantity
Unit
CIP Code
Severity
MACC
TPC
Relocate electrical switch
$626.80
$839.91